During new construction the builder installs drain lines and stubs that will connect to future plumbing fixtures before he pours the slab on grade.
Patching concrete floor after rough plumbing.
How to repair a hole in the floor of a slab foundation.
The temperature of the existing concrete must remain above 50 degrees for the first 24 to 48 hours after the patch is applied.
Many remodel projects in homes with a concrete foundation and slab call for moving plumbing fixtures such as toilets sinks and floor drains.
For a texture pull a damp push broom over the concrete.
Well the contractor walked mid job so i ll be gc ing after all.
Vinyl concrete patch repair quikrete 40 lb.
How to repair a hole in concrete floor in this video renos does a floor repair on a concrete floor.
How to cut a concrete floor for new plumbing.
Wait at least 24 hours before walking on the patch and a week before driving on it.
It has strong adhesive properties allowing it to be applied down to a featheredge.
The cooler the weather the longer the curing time.
This is part of a bathroom remodeling project.
Vinyl concrete patcher is ideal for making smooth repairs to crack or chipped concrete floors sidewalks or steps.