Since a shower has a floor drain waste water empties directly into the plumbing drain system.
Not to plumbing code shower drain floor drain.
Shower compartments where the finished shower drain is depressed a minimum of 2 inches 51 mm below thesurrounding finished floor on thefirst floor level and the shower recess is poured integrally with the adjoining floor.
411 talks about a shower receptor that requires a slope.
If that receptor is the stall itself and the finish floor.
Does the shower pan have to slope towards the drain or can it be flat and only the finished shower floor is required to slope towards the drain.
This being thailand of course chopping out the tiles and redoing the floor is a lot cheaper then buying a pre fab shower cabin.
1672 106 may 5 2008 3 51am.
Ask the builder says to think of your tub as a floor level sink.
Code for shower slope.
But not hard to have someone remove tile and redo slope to drain if in normal corner location but likely to still have some water to slowly dry after any shower.
The only drain you are allowed to in direct is a floor drain.
Installing a shower drain isn t usually difficult but it always pays to be prepared for complications every project is different.
Not only did she permit the floor drains she also indicated the water from the drains could drain to the surface beyond the house just like downspout water from the roof.
Mlarson michael larson wi lic.
The code is the cpc.
Shall be not less than 2 inches or more than 9 i nches deep when measured from the top of the curb to the top of the drain.
The finished floor shall slope uniformily towards the drain not less than 1 4 inch per foot 2 nor more than 1 2 13 mm and the floor drains shall be flangedto provide a water tite joint to.
Floor surfaces under showerheads provided for rins ing laid directly on the ground.