This swms covers high risk construction work hrcw controls related to.
Method statement for concrete floor slab.
Purpose the main purpose of this method statement is to outline the procedure of works for screeding works in compliance with all the required specifications standards and proper construction procedures.
Method statement for casting slab on grade.
Mobile plant movement pressurised gas.
Method statement for concrete coring cutting.
After that they are delivered to the project site to be erected.
By web master november 12 2019.
I temporary protection and supports for equipments structures.
Before commencing any activity on site the consultants must be notified.
Arrange concrete spacer below reinforcement to provide 75 mm minimum concrete covering.
The purpose of this method statement is to explain the proper procedure on how to prepare and cast slab on grade or any horizontal element or member including fixation of steel reinforcement.
Assemble and erect formwork for slab2.
Like with slab saws wall saws also usually feature a diamond blade.
Precast concrete construction system has its own characteristics which influence the layout span length construction depth and stability system to a great extent.
Wall sawing is also used to make openings in ceilings.
This method statement for in situ concrete general concrete work describes the process to be implemented during the entire activity for such as in situ concrete concrete foundations slab on grade blindings columns beams retaining walls slabs raft concrete precast concrete self consolidating concrete mass concrete and any structural concrete works.
Contractors sometimes use this method for cutting floors instead of slab sawing.
Contents concrete floor slab construction process1.
This concrete slab on ground safe work method statement swms covers hazards and controls associated with the preparation of concrete slabs on ground prior to pouring concrete.
Extend joint filler strips width and depth of joint terminating flush with finished concrete surface.
Prepare and place reinforcement for slab3.
Install joint filler strips at slab junction with vertical surfaces such as columns pedestal foundation walls and grade beams.
In precast concrete construction majority of structural members are manufactured in manufacturing plants away from the construction site.
This method statement describes various activities in different stages of work to be carried out while modifying the base slab of the retaining wall.
Pour compact and finishing concrete floor slab4.
Method statement for base slab modification of retaining is given below.
Here is the method statement of slab on grade preparation and concrete pouring.
Must be approved and readily available.
Concrete floor slab construction process includes erection of formwork placement of reinforcement pouring compacting and finishing concrete and lastly removal of formwork and curing of concrete slab.
All the related documents shop drawings method of statements material approvals subcontractor s approvals and test certificates etc.